ISSUE 1 1 CRYSTAL FIRES 1 BECHERS DRIVE AINTREE RACECOURSE BUSINESS PARK AINTREE LIVERPOOL L9 5AY CRYSTAL GEM DECORATIVE FUEL EFFECT GAS FIRE TH
ISSUE 1 10 COAL BED LAYOUT PERIODICALLY SMALL DEPOSITS OF SOOT MAY GATHER ON THE FUEL BED AND BURNER, THIS MUST BE REMOVED BY REMOVING FUEL AND BRUS
ISSUE 1 11 THE EFFECT CAN ALSO COME AS PEBBLES THE LAYOUT IS EXACTLY THE SAME AS ARE THE PIECES HOWEVER THE TOP EFFECT LOOKS LIKE P
ISSUE 1 12 TEST FOR SPILLAGE CHECK FOR SATISFACTORY CLEARANCE OF COMBUSTION PRODUCTS CLOSE ALL DOORS AND WINDOWS IN THE ROOMS CONTAINING THE FIR
ISSUE 1 13 SERVICING NOTES GENERAL NOTES. SERVICING SHOULD BE CARRIED OUT ANNUALLY BY A COMPETENT PERSON SUCH AS A REGISTERED PERSON IN ACCORDANCE WI
ISSUE 1 14 RE ASSEMBLE IN REVERSE ORDER TURN ON GAS SUPPLY. CHECK FOR SOUNDNESS AND RECOMMISION THE FIRE. REPLACEMENT OXY PILOT ASSEMBLY DISCONNECT F
ISSUE 1 15 CRYSTAL FIRES 1 BECHERS DRIVE AINTREE RACECOURSE BUSINESS PARK AINTREE LIVERPOOL L9 5AY GEM DECORATIVE FUEL EFFECT GAS FIRE THIS APPL
ISSUE 1 16 USERS INSTRUCTIONS FOR GEM GAS APPLIANCE YOUR GEM GAS APPLIANCE IS A DECORATIVE LIVE FUEL EFFECT GAS FIRE ,DUE TO ITS NEWNESS THE FIRE M
ISSUE 1 17 MERTIK MAXITROL REMOTE CONTROL SYSTEM THESE INSTRUCTIONS ARE FOR THE USE ON CRYSTAL FIRES REMOTE CONTROL RANGE OF GAS FIRES
ISSUE 1 18 SHUT OFF PROCEDURE 1.TURN KNOB A RIGHT UNTIL REACHING STOP. IN THIS POSITION ONLY PILOT GAS FLOWS 2.TO SHUT OFF VALVE COMPLETELY,PRESS DO
ISSUE 1 19 CLEANING BEFORE CLEANING ANY PART OF THE FIRE ,ENSURE THAT THE GAS IS TURNED OFF AND FIRE IS COOL. BLACK PAINT. USE ONLY CLEAN DAM
ISSUE 1 2 GEM BOX SIZES NOT INCLUDING TRIMS PLEASE READ THESE INSTRUCTIONS CAREFULLY BEFORE YOU START INSTAL
ISSUE 1 20 COAL BED LAYOUT PERIODICALLY SMALL DEPOSITS OF SOOT MAY GATHER ON THE FUEL BED AND BURNER, THIS MUST BE REMOVED BY REMOVING FUEL AND B
ISSUE 1 21 THE EFFECT CAN ALSO COME AS PEBBLES THE LAYOUT IS EXACTLY THE SAME AS ARE THE PIECES HOWEVER THE TOP EFFECT LOOKS LIKE PEBB
GEM LOOSE COAL SET UPREAR MATRIX SITS BEHIND 2 LUGS AND FLAT ON BASE SEE BELOWFRONT FIBRE SITS IN WELL OF BURNER AS ABOVEFRONT 4 LOOSE COALS SIT AS AB
ISSUE 1 3 TECHNICAL DATA GAS TYPE: NATURAL GAS PROPANE GAS PRESSURE: 20mbar 37mbar
ISSUE 1 4 INSTALLATION REQUIREMENTS CONVENTIONAL CHIMNEY A CONVENTIONAL BRICK OR STONE CHIMNEY AS USED FOR SOLID FUEL APPLIANCE WITH A MINIMUM EFFECT
ISSUE 1 5 INSTALLATION REQUIREMENTS FIRETRAY ONLY THE GEM FIRETRAY MAY BE INSTALLED INTO A STANDARD FIREBACK OR HOT BOX INSTALLED WITH A CERAMIC FIR
ISSUE 1 6 A CERAMIC FIREBACK TO BS1251 INSTALLED IN A METAL BOX ,CAN BE USED AS A HOTBOX TO HOUSE T
ISSUE 1 7 INSTALLATION REQUIREMENTS 5 “ FLUE PIPE AND STARTER BOX A DOUBLE WALLED SEL
ISSUE 1 8 FIG 3 THE FRONT FACE SEAL MUST BE FLAT TO ENSURE A GOOD SEAL IS FORMED BETWEEN THE REAR AND BASE OF THE APPLIANCE AND CHIMNEY TO AVOID ANY
ISSUE 1 9 PREVIOUSLY STATED. EXAMINE THE CONDITION AND CARRY OUT ANY REMEDIAL WORK IF THE FLUE HAS BEEN USED FOR SOLID FUEL IT MUST BE SWEPT AND A SM
Komentáře k této Příručce